Houston Intercontinental Airport Runway 15L/33R Reconstruction

Huitt-Zollars served as part of the design team to rehabilitate this existing runway. This project includes both airfield pavement redevelopment and a bonded concrete overlay, reports, preliminary and final design, along with construction phase services. The project scope included design and pavement replacement for 3,000 linear feet of runway; bonded concrete overlay on 5,000 linear feet of existing runway and connecting taxiways. Huitt-Zollars produced the plan sheets for demolition, geometry, joint layout plans and details, SWPPP, paving details, and specifications.

Houston Intercontinental Airport Runway 15L/33R Reconstruction
Houston
Client
Houston Airport System