Huitt-Zollars was responsible for the relocation and improvement of Tatum Boulevard to a four-lane divided roadway with improved horizontal and vertical geometrics, and intersection improvements. The project required careful alignment design to minimize adverse impact to adjacent property owners. Drainage analysis was a key element in the initial study, primarily due to a proposed grade separation to accommodate cross traffic. The study resulted in a safer roadway with a greatly improved horizontal and vertical configuration with minimal impact on adjacent properties. The project included design of traffic signals at three locations, signing, striping, construction sequencing, and traffic control plans.
Tatum Boulevard
Foothill Drive to Sunset Drive, Paradise Valley
Client
Town of Paradise Valley