Long Road Improvements

Long Road reconstruction improvements included approximately 4,950 LF of an existing two-lane residential collector street; the project included Long Lane and Jackson Street. The project scope incorporated the evaluation and optimization of elements in order to maximize pedestrian uses, surface and subsurface drainage system, resolution of ADA issues, pavement section, alignment, and streetscape. Additional project elements included right-of-way assessments, retaining walls, modifications to two small bridges, bidding and construction phase services and an innovative design to mitigate the effects of hazardous winter driving conditions, i.e. icy roads caused by dense vegetation and shadows.