Bell Road Paving

Huitt-Zollars initiated a field survey to update survey information developed by others and to generate required mapping for design of this two-mile section of Bell Road from 45th Street to 64th Street. The project scope included widening the roadway from four lanes to six lanes with curb, gutter, and sidewalk. Upgrades included field survey; drainage design and drainage structure design for 18-inch to 54-inch storm drain lines; landscaping and design of a raised, landscaped median and bus bays; relocation of a water main; and intersection plans with associated traffic signals.

Bell Road Paving
Phoenix
Client
City of Phoenix, Street Transportation Department