Huitt-Zollars prepared surveys, reports, construction plans and details, specifications, and bidding documents for the construction of Dove Loop Road from Dove Road to North Main Street in Grapevine, Texas. The extension primarily consists of the construction of approximately 5,500 LF of new 4-lane undivided roadway in 80 feet of right-of-way, 800 LF of bridges over Farris and Morehead Branches, stormwater mains, stormceptor stormwater handling units, water mains, wastewater lines, median landscaping, street lighting, irrigation, and traffic signalization improvements. Design challenges for this project were to minimize the impact of the proposed roadway on the Lake Grapevine flood storage volume and the impact on the environmentally sensitive areas. The impacts were then mitigated by excavating on a 21-acre US Army Corps of Engineers site for lake volume storage and planting 300 trees per acre for tree mitigation.
Dove Loop Road
Grapevine
Client
City of Grapevine